Work on retaining wall at Pattersons Gap to commence shortly

0
Work on retaining wall at Pattersons Gap to commence shortly

roadblock

PRESS RELEASE – The Ministry of Infrastructure, Port Services and Transport wishes to advise motorists and pedestrians of the imminent construction of a rubble wall along the Leslie Land Road.

As a result, the section of road between the Pattersons Gap Junction and Cedars Road will be closed on Saturday 19th September 2015. That road will be opened on 20th September 2015.

Motorists and pedestrians are advised to exercise caution while traversing this road between 20th to 30th September as construction on this retaining wall will be ongoing during that period.

The MIPST thanks motorists and pedestrians for their understanding and cooperation.

(0)(0)

No posts to display